Well, I'm still waiting for the permit. I heard back from the building code reviewer and he's all finished up so I just need to wait for it to get through admin. I was hoping to have the permit last week but no luck. Maybe this week????

The site is all ready for the next stage. I have lined up the surveyors to come out and stake out the house and garage. They should be able to get it done this week. Then I can have the excavating done. After the excavation is done the surveyor will come back and spike the corners so the form guys will know where to build. I need to get an engineering inspection once the footing forms are in place but before the concrete is poured. This is probably the trickiest timing part of the project.

I'll try calling the city today to see where my permit stands but it's almost impossible to get a straight answer from them.